Acclimatization to high altitude starts after 3 days on the mountain. At Denali's height  full acclimatization takes close to 2 weeks. However, climber's performance does not reach the performance on the sea level. Above 5000 meters the human body starts to deteriorate.  
  Since the elevation between high camps is nearly 1000 meters, more than the optimum, several rest and acclimatization days are scheduled. Carrying of load is divided over two days.  Part of the equipment is cached higher on the mountain while returning lower to sleep. Rest of the supplies is moved  to higher camp next day. 
  Obviously, conditions and acclimatization of the group set the final schedule.

  Elimistön sopeutuminen korkeaan ilmanalaan käynnistyy 3 vuorokauden jälkeen. Denalin korkeudella täydelliseen sopeutumiseen menee lähes 2 viikkoa. Kiipeilijän suorituskyky ei kuitenkaan saavuta meren pinnan tason arvoja. Yli 5000 metrin korkeudessa ihmisen keho alkaa heiketä.
  Yläleirien korkeusero on lähes 1000 metriä eli selvästi yli optimaalisen. Niinpä jokaisessa leirissä vietetään useampi yö palautumisen ja elimistön sopeutumisen vuoksi. Kuorman kanto on jaettu aina kahdelle päivälle. Ensin viedään osa varusteista ylemmäksi vuorelle ja palataan alemmalle nukkumiskorkeudelle. Seuraavana päivänä siirretään loput tavarat ylempään leiriin.
  Lopullisen aikataulun sanelevat olosuhteet ja ryhmän sopeutuminen korkeaan ilmanalaan.


Date Day on mountain Event Max altitude
m
Altitude gain
m
Sleeping altitude m Difference in sleeping altitude m
2.5.2009   Flight Helsinki - Anchorage        
3.5.2009   Anchorage, supplies        
4.5.2009   Talkeetna, climbing registration 109 109 109 109
5.5.2009 1 Flight Talkeetna - Kahiltna Base Camp 2200 2091 2200 2091
6.5.2009 2 Kahiltna Base Camp - Camp 1 Ski Hill 2375 175 2375 175
7.5.2009 3 Camp 1 Ski Hill - Camp 2 Motorcycle Hill 3350 975 3350 975
8.5.2009 4 Camp 2 Motorcycle Hill - load carry to
Windy Corner, back to Camp 2
4100 750 3350 0
9.5.2009 5 Camp 2 Motorcycle Hill, rest day 3350 0 3350 0
10.5.2009 6 Camp 2 Motorcycle Hill - Camp 3 Basin Camp 4350 1000 4350 1000
11.5.2009 7 Camp 3 Basin Camp, rest day 4350 0 4350 0
12.5.2009 8 Camp 3 Basin Camp - load carry to Headwall, back to Camp 3 5000 650 4350 0
13.5.2009 9 Camp 3 Basin Camp, rest day 4350 0 4350 0
14.5.2009 10 Camp 3 Basin Camp - Camp 4 High Camp 5245 895 5245 895
15.5.2009 11 Camp 4 High Camp, rest day 5245 0 5245 0
16.5.2009 12 Camp 4 High Camp, rest day 5245 0 5245 0
17.5.2009 13 SUMMIT DAY, Camp 4 High Camp - SUMMIT - back to Camp 4 6194 949 5245 0
18.5.2009 14 Summit reserve day 6194 949 5245 0
19.5.2009 15 Summit reserve day 6194 949 5245 0
20.5.2009 16 Summit reserve day 6194 949 5245 0
21.5.2009 17 Camp 4 High Camp - Camp 2 Motorcycle Hill 5245 -1895 3350 -1895
22.5.2009 18 Camp 2 Motorcycle Hill - Kahiltna Base Camp 3350 -1150 2200 -1150
23.5.2009 19 Flight Kahiltna Base Camp - Talkeetna 2200 -2091 109 -2091
24.5.2009 20 Talkeetna - Anchorage 109 -109 0 -109
25.5.2009   Anchorage        
26.5.2009   Anchorage        
27.5.2009   Flight from Anchorage        
28.5.2008   Arrival at Helsinki        
Date Day on mountain Event Max altitude
m
Altitude gain
m
Sleeping altitude m Difference in sleeping altitude m

2009 Denali